| Home
Your
Host
Adirondack
Story
Layout
Track Plan
Schematic
Timetable
Layout
Pictures
this
is a powerpoint presentation
Layout
Pictures - Adirondack Branch Pictorial of the C-420
this
is a powerpoint presentation
Operations
Clinics
given by Michel
NEW
CLINICS ADDED APRIL 2008
Trevor
Marshall's Pictures
What's New
Links
of Interest
|
|
|
|
Scale:
|
HO
|
| Size:
|
25x45 feet overall, 80' along walls
|
| Prototype: |
D&H, Saratoga to North Creek N.Y
with extension to
Sanford Lake (TAHAWUS)
|
| Locale:
|
New York State
|
| Period |
1974
+
|
| Layout
style:
|
Along the walls walk in, open staging
|
| Layout
height:
|
48" to 55"
|
| Bench
work:
|
Open grid, cantilevered from walls
|
| Roadbed: |
Cork
on plywood
|
| Track:
|
Code
100
|
| Turnouts: |
4's
and 6's
|
| Minimum
Radius: |
24"
|
| Length
of mainline: |
193' linear mainline not including
the Saratoga staging and the Tahawus Complex
|
| Scenery:
|
Carved Styrofoam Sculptamold
on Styrofoam base
|
| Backdrop: |
Painted
on Walls
|
| Power
system |
Lenz
DCC, sound equipped
|
| Operations:
|
Car cards, 4 sided
Waybills, dispatcher,
Telephone system, fast clock
|
| Typical
Operating Crew:
|
6
to 8
|
| Operations:
|
The
following trains operate on the branch:
Local to Corinth
Local
to Warrensburg, North Creek
Local to
Sanford Lake and Tahawus
Mine Unit
Train(s)
Employee passenger service
Tourist Train (PA’s)
|
We operate
following a Timetable and a fast clock on 6:1 ratio.
Timetable
Operation provides a framework for the operating session and regulates
traffic flows. This operating layout can accommodate up to 8 operators and
a Dispatcher. Operating Sessions last from 2 to 2 ½ hours depending on
the abilities of Operators to complete their assignments on schedule.
|